[Construction Case] Slab Foundation House: Void Filling Work (Tokyo)
A gap or cavity of approximately 200mm at most occurred! A case where it was resolved in one day using the up-con method.
We would like to introduce a case of "void filling work" conducted on a slab foundation house located in Tokyo. Due to ground subsidence, the ground level has lowered, resulting in the formation of voids beneath the slab foundation of the house. The voids were resolved in a single day of construction. 【Case Overview】 ■ Maximum void: Approximately 200mm ■ Area: Tokyo ■ Construction period: 1 day *For more details, please refer to the PDF document or feel free to contact us.